The construction quality control of the spray dryer installation project should start from the spray dryer control, including the unpacking inspection of the goods, until the project acceptance procedures are completed. Only in this way can the quality of the installation project be effectively guaranteed.
1. Unpacking acceptance
After the new spray dryer arrives, the management department, together with the purchasing unit, the user unit (or the receiving unit), conduct unpacking and acceptance, and check whether the spray dryer is damaged or lost during transportation, accessories and random spare parts. Whether special tools, technical data, etc. are related to the contract. The packing list is in line with the packing list, and the unpacking acceptance form should be filled out and stored in the file. If there is any defect or unqualified phenomenon, it should immediately negotiate with the relevant unit, ask for or claim.
2. Installation and construction of spray dryer
According to the spray dryer process layout drawing and installation construction drawing, foundation drawing, spray dryer outline size and mutual distance drawn by the process technology department, draw lines and position, organize the foundation construction and the spray dryer transportation in place. When designing the spray dryer process layout, the following factors should be considered for the positioning of the spray dryer.
The quality of the installation project of the spray dryer is related to whether the installation project of the spray dryer can be delivered for use. Therefore, the construction personnel must always strictly control the quality, and not forget the commitment to the quality of the project while ensuring the progress.
https://www.stardrying.com/